Exam Number/Code: MB3-637

Exam name: GP 10.0 Manufacturing Applications

MB3-637 test is the important of Microsoft certification. Only you pass the MB3-637 exam you could have the chance to get Microsoft certification. To help examinee, Exambible publish the Questions and Answers about MB3-637 exam. And the 100 simulation exam are all designed by expert from Exambible. Examinees could have an enough prepare by these simulation exercises and pass the MB3-637 test successfully.
Exambible also provide free MB3-637 Demo, examinees can download and use before buying MB3-637 Q&As, then decide if they need to purchase.

More Microsoft Microsoft Business Solutions Resources

Recommended Microsoft exams

  • Microsoft 70-691 exam: TS: Windows HPC Server 2008, Developing
  • Microsoft 70-652 exam: TS: Windows Server Virtualization, Configuring
  • Microsoft 70-218 exam: MCSE Managing a Microsoft Windows 2000 Network Environment
  • Microsoft 70-502 exam: TS: Microsoft .NET Framework 3.5 - Windows Presentation Foundation
  • Microsoft 70-654 exam: TS:Windows Essential Business Server 2008, Configuring
  • Microsoft 70-448 exam: TS:MS SQL Server 2008.Business Intelligence Dev & Maintenan
  • Microsoft 70-655 exam: TS:Windows Vista & Serv Op Systems, Pre-Installing for OE
  • Microsoft MB4-640 exam: SL 7.0 Customization Manager
  • Microsoft MB6-283 exam: Axapta 3.0 Questionnaire
  • Microsoft MB3-216 exam: Great Plains 8.0 Financials
  • Microsoft 70-562CSharp exam: TS:MS.NET Framework 3.5, ASP.NET Application Development
  • Microsoft 70-086 exam: MCSA 2003 Implementing and Supporting Systems Management Server 2.0

Microsoft Microsoft Business Solutions MB3-637 Web Demo

This webdemo is just a demo data, only for reference and learning, there is no other purposes.

1. Which of the following is true concerning the Safety Stock field in the Item Resource Planning window?
A. It is combined with the Order Point Quantity field by MRP to produce MRP planned orders
B. It is combined with the Order Point Quantity, and the Fixed Order Quantity fields to produce MRP planned orders
C. It is combined with the Fixed Order Quantity field to produce MRP planned orders
D. The field is informational only and not considered by MRP
Answer: D


2.The Dynamics - GP Distribution Series BOM and the Manufacturing Series BOM both have a bill of material (BOM) module. Which statement best describes their compatibility?
A. The Manufacturing bill of material module is a complete separate entity from the Distribution Series bill of material module
B. Distribution Series does not have a Bill of Material module, so there is no compatibility issue
C. The Distribution and Manufacturing modules have an interface that allows for linking these two modules
D. When you install Manufacturing, the system automatically converts Distribution information to the manufacturing bill of material tables
Answer: A

3. What is the term used for routings that are created within routings, and that outline a series of steps that are common to all items?
A. Pointer routings
B. Subsequent routings
C. Active Routings
D. Planning Routings
Answer: A

4. If a manufacturing process results in needing 10% more of a particular component due to scrap in the process, what window should be used to assign a 10% shrinkage factor?
A. BOM Header Edit
B. BOM Entry
C. Item Engineering
D. Item Resource Planning
Answer: B

5. If quick manufacturing orders are being used, what option(s) must be marked in the Routing sequence entry screen? Choose the 2 that apply.
A. Auto-Back flush Labor
B. Auto-Back flush Machine
C. Auto-Back flush Material
D. Auto-Back flush All
Answer: AB

6. If it takes two employees one hour to complete a routing step, what should the value for labor time and cycle time be for that routing step to accurately reflect proper costing and scheduling?
A. Labor = 1, Cycle = 1
B. Labor =1, Cycle = 2
C. Labor = 2, Cycle = 1
D. Labor = 2, Cycle = 2
Answer: C

7. Which of the following routing times are calculated on a per piece basis? Choose the 2 that apply.
A. Setup Time
B. Labor Time
C. Machine Time
D. Queue Time
Answer: BC

8. Which of the following is true concerning the Order Point Quantity field in the Item Resource Planning window?
A. Order point quantities may only be used with Fixed Order Quantities
B. Order point quantities are only considered by MRP for sites, not default values
C. Order point quantities are for buy items only
D. Order point quantities are informational only
Answer: B