Worldwide:

920-502, Nortel Other Nortel Certification 920-502 Exam

920-502 Exam

Nortel 920-502 exam
  • Questions and Answers
  • 118 Q&As
  • Update time
  • March 12th,2010
  • Software Price
  • $159.99 $109.99

loading loading

Product Description

Exam Number/Code: 920-502

Exam name: nncss-optera metro 3000

920-502 test is the important of Nortel certification. Only you pass the 920-502 exam you could have the chance to get Nortel certification. To help examinee, Exambible publish the Questions and Answers about 920-502 exam. And the 118 simulation exam are all designed by expert from Exambible. Examinees could have an enough prepare by these simulation exercises and pass the 920-502 test successfully.
Exambible also provide free 920-502 Demo, examinees can download and use before buying 920-502 Q&As, then decide if they need to purchase.

More Nortel Other Nortel Certification Resources

Recommended Nortel exams

  • Nortel 920-548 exam: Carrier VoIP Border Control Point Configuration and Datafill
  • Nortel 920-808 exam: Real-Time Networking Technologies
  • Nortel 920-203 exam: nncds passport 7000/15000
  • Nortel 920-261 exam: Nortel Application Switch Rls.24.x Configuration & Admin
  • Nortel 920-253 exam: NCDS-Nortel VPN Router (Contivity)Rls.6.0
  • Nortel 922-053 exam: GSM BTS 18000 Installation and Commissioning
  • Nortel 922-058 exam: GSM BTS S8000/S 12000 Maintenance-Cell Site
  • Nortel 920-361 exam: Communication Server 1000 Rls 6.0 Database Administration
  • Nortel 920-182 exam: Callpilot RIS.5.0 Instakkattion & Configuration
  • Nortel 920-235 exam: Nortel VPN Gateway Rls.7.0 Configuration & Management
  • Nortel 920-344 exam: BCM50/450 Rls. 5.0 Sales Engineering
  • Nortel 920-193 exam: ncss-business communications manager 50(bcm50)rls.1.0

Nortel Other Nortel Certification 920-502 Web Demo

This webdemo is just a demo data, only for reference and learning, there is no other purposes.

1.You are fibering a Band 1 OMX module. How is the "Channel 1 Add port" utilized in order to allow Band 1 Channel 1 traffic signals to be added and dropped at a site?
A. This port is connected to the Band 1 OMX module OTS out port.
B. This port is connected to the Band 1 Channel 1 drop port of the Band 1 OMX module.
C. This port is connected to the receive port of a Band 1 Channel 1 OC-48 optical circuit pack.
D. This port is connected to the transmit port of a Band 1 Channel 1 OC-48 optical circuit pack .
Answer: D

3. Which timing source is best quality for use at the head-end in an OPTera Metro 3500 network?
A. SMC quality line source
B. ST4 quality BITS source
C. ST2 quality BITS source
D. internal timing from VTX-48
Answer: C

4. One NE on an OPTera Metro 3500 network is having problems being accessed from a remote NP. What is the problem?
A. The NE is not on the NP's SOC.
B. The wrong date and time is set for the afflicted NE.
C. The afflicted NE has a non-unique system identifier.
D. The IP address of the afflicted NE is on the wrong subnet.
Answer: C

5. You have a protected four-channel DWDM implementation on the OPTera Metro 3500 platform. What is the minimum number of OMX modules required at the terminal site?
A. one
B. two
C. three
D. four
Answer: B

6. You are dispatched to solve a problem with an OPTera Metro 3000 network. You checked the fiber connections and found that the fiber pair from slot 11 on one shelf is always connected to slot 12 of the next shelf. Which network topology has been configured?
A. UPSR configuration
B. Linear ADM configuration
C. Folded-Ring configuration
D. Matched-Node configuration
Answer: A

7. You have a three-node USPR network with OC-12 line rate. Which pass through cross-connect is valid?
A. fromAID = OC12-11-1; toAID = DS3-9; CCT = 2WAY
B. fromAID = OC12-11-1; toAID = OC12-12-1; CCT = 2WAYPR
C. fromAID = OC12-11-1-1-1; toAID = OC12-12-1-1-1; CCT = 2WAY
D. fromAID = OC12-11-1-1-1; toAID = OC12-12-1-1-1; CCT = 2WAYPR
Answer: C

8. Which statement is true about the relationship between facilities and equipment on the OPTera Metro 3000?
A. Facilities are the individual signal ports located on an equipment circuit pack card.
B. Facilities are the buildings or locations where the OPTera Metro equipment is installed.
C. Facilities are the I/O modules associated with the circuit pack located in the corresponding slot on the shelf.
D. OPTera Metro 3000 recognizes equipment specifications but allows the facilities option to determine maximum capacities.
Answer: A

2. You want to reprovision a shelf with DS3s instead of DS1s. How do you delete a PSC from an OPTera Metro 3500 shelf?
A. All DS1 facilities must be put out-of-service before the PSC can be put out-of-service and deleted.
B. All DS1 and DS3 facilities must be put out-of-service before the PSC can be put out-of-service and deleted.
C. All DS1 facilities and equipment must be put out-of-service and deleted before the PSC can be put out-of-service and deleted.
D. All DS1 and DS3 facilities and equipment must be put out-of-service and deleted before the PSC can be put out-of-service and deleted.
Answer: C


Exambible materials do not contain actual questions and answers from Microsoft's Certification Exams.