Worldwide:

920-328, Nortel Other Nortel Certification 920-328 Exam

920-328 Exam

Nortel 920-328 exam
  • Questions and Answers
  • 60 Q&As
  • Update time
  • February 20th,2010
  • Software Price
  • $159.99 $109.99

loading loading

Product Description

Exam Number/Code: 920-328

Exam name: MCS 5100 Rls.4.0 Planning & Engineeing

920-328 test is the important of Nortel certifaction. Only you pass the 920-328 exam you could have the chance to get Nortel certifaction. To help examinee, Exambible publish the Questions and Answers about 920-328 exam. And the 60 Q&As simulation exam are all designed by expert from Exambible. Examinees could have an enough prepare by these simulation exercises and pass the 920-328 test successfully.
Exambible also provide free 920-328 Demo, examinees can download and use before buying 920-328 Q&As, then decide if they need to purchase.

Why choose Exambible 920-328 braindumps

  • Quality and Value for the 920-328 Exam
  • 100% Guarantee to Pass Your 920-328 Exam
  • Downloadable, Interactive 920-328 Testing engines
  • Verified Answers Researched by Industry Experts
  • Drag and Drop questions as experienced in the Actual Exams
  • Practice Test Questions accompanied by exhibits
  • Our Practice Test Questions are backed by our 100% MONEY BACK GUARANTEE.

Exambible 920-328 Exam Features

  • Quality and Value for the 920-328 ExamExambible Practice Exams for Nortel 920-328 are written to the highest standards of technical accuracy, using only certified subject matter experts and published authors for development.
  • 100% Guarantee to Pass Your 920-328 ExamIf you prepare for the exam using our Exambible testing engine, we guarantee your success in the first attempt. If you do not pass the Other Nortel Certification 920-328 exam (ProCurve Secure WAN) on your first attempt we will give you a FULL REFUND of your purchasing fee AND send you another same value product for free.
  • Nortel 920-328 Downloadable, Printable Exams (in PDF format)Our Exam 920-328 Preparation Material provides you everything you will need to take your 920-328 Exam. The 920-328 Exam details are researched and produced by Professional Certification Experts who are constantly using industry experience to produce precise, and logical. You may get questions from different web sites or books, but logic is the key. Our Product will help you not only pass in the first try, but also save your valuable time.
  • 920-328 Downloadable, Interactive Testing enginesWe are all well aware that a major problem in the IT industry is that there is a lack of quality study materials. Our Exam Preparation Material provides you everything you will need to take a certification examination. Like actual certification exams, our Practice Tests are in multiple-choice (MCQs) Our Nortel 920-328 Exam will provide you with exam questions with verified answers that reflect the actual exam. These questions and answers provide you with the experience of taking the actual test. High quality and Value for the 920-328 Exam:100% Guarantee to Pass Your Other Nortel Certification exam and get your Other Nortel Certification Certification.

Nortel Other Nortel Certification 920-328 Web Demo

This webdemo is just a demo data, only for reference and learning, there is no other purposes

1.Click the Exhibit button.
A customer has a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system and is planning to implement Ad Hoc conferencing. They want to provide up to 200 conference ports and do not want to limit the number of conference-call attendees that can be supported on each conference call.
Assuming that the customer uses the G.729 CODEC with a packetization time (Ptime) of 20 milliseconds (ms), which installation recommendation should be made to satisfy their requirements?
A.One Media Application Server (IBM x336)
B.Two Media Application Servers (IBM x336)
C.Four Media Application Servers (IBM x336)
D.Three Media Application Servers (IBM x336)
Answer: B

3. A customer with a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system wants to have full redundancy for an IP Client Manager (IPCM) Server. The first level of redundancy is achieved by deploying two IPCM servers.
What is the component that provides the second level of redundancy in case both IPCM servers fail?
A.Client Adapter
B.System Manager
C.Multimedia PC Client
D.Provisioning Manager
Answer: C

4. Given the following information:
A customer has a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system with the required functional components and a SIP PRI Gateway.
All users have the Multimedia PC Client installed on their PCs for their telephony and multimedia services.
They require that all users have access to Meet Me conferencing services with no limitation on the number of participants that a single conference can support.
Assume that all users have been assigned a default service package that allows Meet Me conferencing.
Which recommendation should be made to satisfy their requirements?
A.Install a SIP Audio Server in the MCS 5100 system.
B.Install a Media Application Server in the MCS 5100 system.
C.Update the service package to remove the limitation of 10 supported participants on a conference call.
D.Install a SIP Audio Server or a Media Application Server in the MCS 5100 Rls. 4.0 system, because either can support the required Meet Me conferencing services.
Answer: B

5. A customer has purchased a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. They want to use Ad Hoc and Meet Me conferencing services while minimizing costs.
Which server configuration should be recommended?
A.One Media Application Server
B.Two Media Application Servers
C.One H.323 Conference Server
D.Two H.323 Conference Servers
Answer: B

6. A customer has a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system installed that is providing services to 500 IP Phone 2002 and 2004 telephones in their administration department. They have decided to provide services to their engineering department. They plan to deploy 500 Multimedia PC Clients to provide them with access to traditional telephony services, video calls, Instant Messaging (IM) and whiteboarding.
How will the new Multimedia PC Clients communicate with the MCS 5100 Rls. 4.0 system?
A.The Multimedia PC Clients will use the Session Manager to access the SIP network.
B.The Multimedia PC Clients will use the existing IP Client Manager (IPCM) to access the SIP network.
C.A Media Application Server will have to be installed to enable the Multimedia PC Clients to access the SIP network.
D.An IP Client Manager (IPCM) will have to be installed to enable the Multimedia PC Clients to access the SIP network.
Answer: A

7. Within a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, the Media Concentration Center (MCC) hosts the Media Application Server and the Border Control Point.
What should this Level-3 site be located close to, or co-located with, to shorten the media paths?
A.MCS Client Site
B.Network Control Center (NCC)
C.Local Point-of-Presence (POP)
D.Network Signaling Center (NSC)
Answer: C

8. A customer plans to purchase a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. One of their requirements is to provide secure Instant Messaging (IM) on their IP Phone 2002.
How is the encryption/decryption of secure IM for the IP Phone 2002 accomplished?
A.The IP Phone 2002 must be configured to perform the encryption/decryption.
B.The Session Manager performs the encryption/decryption on behalf of the IP Phones.
C.The IP Phone 2002 requires Personal Agent to be installed to perform the encryption/decryption.
D.The IP Client Manager (IPCM) performs the encryption/decryption on behalf of the IP Phone 2002.
Answer: D

2. A customer has a Multimedia Communication Server (MCS) 5100 Rls. 0 system with all the necessary components providing telephony services to its users.
To bill them for the services provided, how is the required billing information delivered to the back-end billing system via File Transfer Protocol (FTP)?
A.The raw billing data is sent to the System Manager, which formats and stores the data on the Database Manager before transporting it via FTP to the back-end billing system.
B.The raw billing data is sent to the Session Manager, which formats and stores the data on the Database Manager before transporting it via FTP to the back-end billing system.
C.The raw billing data is sent to the System Manager and then it is sent to the Accounting Manager, which formats and stores the data before transporting it via FTP to the back-end billing system.
D.The raw billing data is sent to the Session Manager and then it is sent to the Accounting Manager, which formats and stores the data before transporting it via FTP to the back-end billing system.
Answer: D


Exambible materials do not contain actual questions and answers from Microsoft's Certification Exams.